The lower level of the building houses elite locker rooms for the Edina High School Boys and Girls teams, as well as coaching offices, training equipment and study rooms. The upper level of the addition includes a retail sporting goods store and a hockey training center. The concrete masonry structure was constructed within an accelerated five month schedule to meet hockey season demands.