RJM Construction was hired by the City of St. Louis Park to oversee construction of a multi-use recreational outdoor facility on the campus of The Rec Center.
The project includes an NHL-sized refrigerated outdoor ice rink that can be converted into a covered turf field each spring.
The roof structure was built with glue-laminated beams, tensile fabric, and steel cabling support. Working with two out-of-state contractors, RJM used Revit technology to model the roof design, mitigating risk and minimizing challenges. The spectator area includes bleachers and an outdoor plaza with a fire pit. The project also includes team locker rooms and a covered walkway that leads visitors through the plaza, into The Rec Center.
Share